ESTMZ™ Enhanced Single-Trip Multizone Completion System

 

Designed for use in deepwater and ultra-deepwater offshore completions, the ESTMZ™ system enables several intervals within a well to be isolated and treated with a high-rate frac pack during a single trip of the workstring.

ESTMZ

  • Full 10,000 psi differential pressure rating
  • Highest rated frac and proppant rating in the industry
  • Largest system ID in the industry
  • Modular screen provides formation isolation
  • Capture short, low reserve intervals that would normally be bypassed
  • Accommodates SmartWell® system completions

The Deepwater Completion Solution Example
Halliburton's ESTMZ™ system has the potential to save up to 42 days of rig time on a five zone (1,400 foot producing interval) Lower Tertiary completion.  Based on a $1 MM spread rate that is a $42 MM savings!

ESTMZ™ Enhanced Single-Trip Multizone Completion System

Filter By  
Show     results per page
  Title Date
Summary Complex Subsea ESTMZ™ System and Intelligent Completion Technology Saves Customer Major Setbacks Aug 2015
Summary Halliburton Sets Industry Record for Jack/St. Malo Project Jun 2015
Summary TOTAL Exploration and Production Indonesie breaks the record with the shortest ESTMZ™ system installation time Dec 2013
Summary How Chevron saved an average of 18 days per well on three deepwater GoM wells Aug 2013
Showing 1 - 4 of 4 Records
1  
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.