System.NullReferenceException: Object reference not set to an instance of an object. at LSDS.Utility.SiteIdentity.GetSiteNameFromURL() at Halliburton.webresources.uc.controls.ProductsProductList.RetrieveProductPages() at Halliburton.webresources.uc.controls.ProductsProductList.Page_Load(Object sender, EventArgs e) Slurries - Halliburton

Slurries

Designed Cements represent Halliburton's continuous advancements in cementing technology driven by more than 90 years of experience with increasingly challenging wellbore conditions. Wellbore conditions vary and the slurry design must account for well depth, bottomhole circulating and static temperature, the type and hydrostatic pressure of the drilling fluid, the potential for lost circulation and/or gas migration among many other influential variables. Designed cements are part of the Designed Cementing Solutions™ systems that provide families of slurries designed for major wellbore-condition challenges facing the industry. Since no single slurry, or family of slurries, is ideal for every well condition, choices allow the optimal solution for each combination of conditions and needs. Cement slurries designed for a given well environment can provide optimal zonal-isolation performance. Good zonal isolation is essential to prevent loss of production, control gas migration, provide protection from corrosive formation waters, reduce water production, and improve confinement of stimulation treatments.

Slurries

Filter By  
Show     results per page
  Title Date
Summary Squeeze Cementing Expertise Helps Save $2 Million Wildcat Well Dec 2015
Summary Foam Cementing Water Control Treatment Adds Value of $276,500 to $7.8 Million Dec 2015
Summary DeepWater Flo-Stop Cementing Saves Texaco at Least $250,000 Dec 2015
Summary World Record Offshore Foam Cement Job Offers Potential Savings to the Operator of at Least $3 Million Dec 2015
Summary PET and Statistical Variation Technology Help Validate the Economy of Lightweight and Foam Cementing Dec 2015
Summary Enhancer 923 agent blended into cement slurry overcomes annular gas migration issues in the Barnett Shale Jan 2015
Summary Cemented VersaFlex® expandable liner hanger provided superior reliability and saved 24 hours of rig time Sep 2014
Summary Lightweight Cementing Solutions In Difficult, Managed-Pressure Drilling Application May 2014
Summary How Halliburton helped lower costs of geothermal wells Dec 2011
Showing 1 - 9 of 9 Records
1  
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.