Long-Term Zonal Isolation
What is cementing reliability worth?
In horizontal wells, it’s long-term zonal isolation that significantly improves well economics.
Industry Challenge
Produce at the highest rate and lowest cost by maximizing exposure to the reservoir and eliminating communication between fractures.
Halliburton Solution
Collaborative engineering analysis to optimize wellbore preparation and cement slurry placement (drilling fluid conditioning, spacers, stand-off, and job design).
High-performance, light-weight primary cement sheath engineered with required mechanical properties, yet with densities lower than 800 kg/m3:
Operator Benefits
Reliable annular seal helps enhance well economics:
- Helps sustain production
- Withstands cumulative stresses from pressure and well testing, injection and stimulation treatments and production cycling
- Helps mitigate the need for remedial cementing
Comments? Questions? Need More Information?