Engineered Casing Solutions
What is reliability worth?
Addressing the risk of cement-bond failure to increase the productive life of the well
Industry Challenge
Mitigate the risk of cement-bond failure while reducing time for running and landing casing to total depth.
Halliburton Solution
Halliburton promotes long-term zonal isolation by properly preparing the wellbore and optimally delivering Tuned® cement slurries with the aid of engineered casing solutions:
Operator Benefit
- Enables smooth, uninterrupted flow of cement during circulation for homogenous cement slurry placement
- Enhanced mud removal
- Achieve zonal isolation integrity for long-term production
Comments? Questions? Need More Information?