Engineered Casing Solutions
Industry Challenge:
Mitigate the risk of cement-bond failure while reducing time for running and landing casing to total depth.
|

|
LO-Gard® Service
Control fluid loss to the formation during electric submersible pump (ESP) installation, TCP operations, gravel-pack operations or while performing clean outs, tubing changes, etc.
|

|
Horizontal Wells Fracturing
Industry Challenge:
British Columbia, Canada—A Canadian operator used Halliburton’s CobraMax® H service to place multiple fractures in a horizontal well in the Montney shale formation. The treatment was successful and the well produced 160,000 m3 gas/day (5.6 mmcf/d) which was more than the operator expected.
|

|
Challenge Builds Character -- and Better Tools and Technologies
To operators around the world, Halliburton says “Thank You” for entrusting us with your major completion and production projects. And thanks for challenging us with the toughest obstacles you face—including deeper wells, deeper water, higher pressures, higher temperatures, more zones, narrower zones and environmental sustainability.
|

|
What does simplifying complex completions deliver?
Zonal Isolation Challenge:
- Water and Gas Shutoff
- Multizone Stimulation
- Cement Integrity
- Openhole Intelligent Completions
|

|
Halliburton’s Swellpacker™ OBM
Industry Challenge:
- Being able to depend on a proven, engineered solution that controls the elastomer swelling process
- Achieving complete zonal isolation of producing zones
|

|
Stimwatch® and GuidonSM AGS
Industry Challenge:
- Stimulating production of all targeted oil and gas zones–but not water zones
- Reducing the costs of blind acid placement
|

|
Global Completions Leader
Ideally, you’d prefer a global leader in completions technology who has the rare ability to handle any and all engineering challenges.
|

|
Subsurface Control Valve III (SSC III)
Industry Challenge:
- Rising rig costs /reduced rig availability
|

|
Beyond Red Zone® Frac Pac System™
Industry Challenge:
Extreme bottomhole conditions:
- Ultra-deepwater (> 5,000 ft water)
- Deep well in low permeability, high-strength rock
- High pore pressure gradients (up to 15,000 psi).
|

|
CobraMax® H Fracturing Service
Industry Challenge:
-
Improve sustained production
-
Consistently create fractures in cased and cemented horizontal wellbores
-
Optimize frac design
-
Overcome flow-convergence issues, especially in near-wellbore region
|

|
Swellpacker® Cable System
Industry Challenge:
Improving well construction economics in multilateral SmartWell® completions.
|

|
GasPerm 1000SM
Industry Challenge:
Increase gas and oil recovery in the low-permeability Codell formation of the mature DJ Basin by economically improving completion procedures.
|

|
New AquaStimSM Water Frac Service with GasPerm 1000™
Texas Panhandle - Recently, Halliburton introduced its specially formulated SandWedge® enhancer and OptiKleen-WF™ agent to the Operator's normal four-stage water frac completions in the Granite Washplay in the Texas Panhandle.
|
|
Congratulations, Chevron.
With this discovery, you've taken the industry to a whole new level.
|
|
VersaFlex® Expandable Liner Hanger System
What is reliability worth?
It's simplifying complex completions— especially in tough well conditions.
|
|
Multi-Zone Completions
What is reliability worth?
It's economically streamlining multi-zone completions while increasing reliability.
|
|
Liu Ming Qiu
Completion Leader
Tarim Oil Company, China
“When you combine high-velocity wells with the world’s highest production—over 450 mm cfpd per well—reliable subsurface safety valves are critical.”
|
|
Bill Chaney
Vice President
Winchester Production, USA
“We don’t have to worry about product and service quality. Which allows us to create additional value in today’s fast paced environment.”
|