Case Studies

See why leading companies are choosing Halliburton products and services for their upstream energy needs.

Choose Area



  = Sign in required
Filter By  
  Title 5 Date
Summary 05.875 Petroleum Development Harweel Cluster OmanOutstanding Well Performance (Case History) Sep 2004
Summary 1062 Horizontal System with OMNI Valve Turns Low-Temperature Miocene Gas Sand Well Into Prolific (Case History) May 2003
Summary 3-Slurry Annular Re-cementing Job Brought Cement to Surface and Helped Operator Stop Salt Water Intrusion Jun 2006
Summary 7" Foam Wiper Ball Successfully Pumped through Drill Bit Feb 2006
Summary 9 BCF Field Development Opportunity Identified by Sigma Process using ANN Technology May 2003
Summary A High Value, Low Cost SmartWell Completion for West Africa Field Sep 2008
Summary A Real-Time, Collaborative Environment to “Model, Measure and Optimize" Saves Petroamazonas Time and Doubles Production (Ecuador) Oct 2009
Summary ACCOLADE System Handles 850-bbl Saltwater Flow in GOM Shelf Well Production Interval Apr 2008
Summary ACCOLADE/ENCORE/LE-SUPERMUL - 16.0 ppg ACCOLADE® Clay-Free Fluid Apr 2008
Summary ACCOLADE/TAU-MOD™ Viscosifier Enhanced Rheology Apr 2008
Showing 1 - 10 of 799 Records
1  2  3  4  5  6  7  8  9  10  [...]  [Next]